A building the size of the Dining Hall requires a strong foundation and protection from earthquakes, so a large number of stones is used in conjuction with pillars, concrete, and rebar. The foundation is being constructed now and is projected to be complete by the end of July.
To avoid transport costs, the concrete blocks that will form the main structure are being formed on site. To date, 2800 blocks have been formed of a total 4500 that are required. At the current rate, all of the blocks necessary to complete the building will be ready by mid-August.
Please continue to pray for the work that the Lord is doing at Nyabihu Christian Academy and for the lives that will be impacted by the completion of this building. If you'd like to support this effort, please click here to donate.